Mattioda S.p.a. – Nati per Costruire
it
en
  • About us
  • Construction site
  • Documents
  • Customers
  • Contacts
  • Login
it
en
LOGIN
  • Tunnels
  • Roads and bridges
  • Pubblic e private construction
  • Photovoltaic system and hydroeletric power plants
Adaptation of the viaduct Marchetti on the A4 / 5 Ivrea – Santhià (TO)
Redevelopment of the road Larzey- Entreves in Courmayeur (AO)
Reconstruction and enlargement of the railway underpass in Camporosso (IM)
S.P. 156 “di Lusernetta” – Bypass road between Bibiana and Luserna San Giovanni (TO)
S.S. n° 26 ” della Valle d’Aosta” – Reconstruction of the bridge over the river Saint Barthelemy – Nus (AO)
S.S. n°460 “di Ceresole Reale” – Road bypass of the town of Cuorgnè (TO)
A32 “Torino – Bardonecchia” – Construction of the fourth lane between Oulx and Bardonecchia (TO)
Construction of lot 1 ° and 2 ° of the 2nd section of the motorway Orbassano – Pinerolo (TO)
Other construction site
ATIVA S.p.A.

Adaptation of the viaduct Marchetti on the A4 / 5 Ivrea – Santhià (TO)

Pavone Canavese (TO)
ATIVA S.p.A.

Adaptation of the viaduct Marchetti on the A4 / 5 Ivrea – Santhià (TO)

Pavone Canavese (TO)
Technical features
Description

Adaptation of the viaduct Marchetti on the A4 / 5 Ivrea – Santhià

Year 2012-2015
Value of work 33.670.898,04 €
Notes

lenght: 258 m – width: 41 m – span: 1 – arch height: 52 m

Mattioda Pierino & Figli S.p.A. - Loc. Bandone, 1/G 10082 Cuorgnè (TO) - tel. +39 0124 617860 fax. +39 0124 617690 - p.iva 00476210018
Registro imprese di Torino 00476210018 - R.E.A. n. 271076 - Capitale Sociale € 7.200.000 interamente versato
Attività di direzione e coordinamento esercitata da FIN.CO. S.r.l. R.I. TORINO n. 01889630016

Questo sito web utilizza cookie esclusivamente tecnici per permettere una corretta navigazione e la completa fruizione di tutti i contenuti da parte dell'utente. Non utilizza in alcun modo cookie di profilazione. Accetta
Privacy & Cookies Policy