ATIVA S.p.A.

A5 ” Torino – Quincinetto ” – Adaptation of the track Aosta – Settimo of the barrier toll collection of Settimo T.se (TO)

Casello di Settimo T.se (TO)
ATIVA S.p.A.

A5 ” Torino – Quincinetto ” – Adaptation of the track Aosta – Settimo of the barrier toll collection of Settimo T.se (TO)

Casello di Settimo T.se (TO)
Technical features
Description

A5 ” Torino – Quincinetto ” – Adaptation of the track AostaSettimo of the barrier toll collection of Settimo T.se

Year 2011-2012
Value of work 2.209.014,99 €
Notes

prefabricated steel structuremodernization 4 toll collection slopes