
ATIVA S.p.A.
A5 ” Torino – Quincinetto ” – Adaptation of the track Aosta – Settimo of the barrier toll collection of Settimo T.se (TO)
Casello di Settimo T.se (TO)
ATIVA S.p.A.
A5 ” Torino – Quincinetto ” – Adaptation of the track Aosta – Settimo of the barrier toll collection of Settimo T.se (TO)
Casello di Settimo T.se (TO)Technical features | |
---|---|
Description | A5 ” Torino – Quincinetto ” – Adaptation of the track Aosta – Settimo of the barrier toll collection of Settimo T.se |
Year | 2011-2012 |
Value of work | 2.209.014,99 € |
Notes | prefabricated steel structure – modernization 4 toll collection slopes |

