ATIVA S.p.A.

Construction of the 1st and 2nd lot of the 2nd section of the Orbassano – Pinerolo motorway (TO)

Orbassano - Pinerolo (TO)
ATIVA S.p.A.

Construction of the 1st and 2nd lot of the 2nd section of the Orbassano – Pinerolo motorway (TO)

Orbassano - Pinerolo (TO)
Technical features
Description

Construction of the 1st and 2nd lot of the 2nd section of the Orbassano – Pinerolo motorway (TO)

Year 2003-2005
Value of work 36.300.593,04 €
Notes

lenght: 8.350 m– width: 2 carriageways of 10,50 m – 1 road tunnel 90 m