
ATIVA S.p.A.
Construction of the 1st and 2nd lot of the 2nd section of the Orbassano – Pinerolo motorway (TO)
Orbassano - Pinerolo (TO)
ATIVA S.p.A.
Construction of the 1st and 2nd lot of the 2nd section of the Orbassano – Pinerolo motorway (TO)
Orbassano - Pinerolo (TO)Technical features | |
---|---|
Description | Construction of the 1st and 2nd lot of the 2nd section of the Orbassano – Pinerolo motorway (TO) |
Year | 2003-2005 |
Value of work | 36.300.593,04 € |
Notes | lenght: 8.350 m– width: 2 carriageways of 10,50 m – 1 road tunnel 90 m |


